Multi-Objective Analysis of a CHP Plant Integrated Microgrid in Pakistan

Welcome to DSpace BU Repository

Welcome to the Bahria University DSpace digital repository. DSpace is a digital service that collects, preserves, and distributes digital material. Repositories are important tools for preserving an organization's legacy; they facilitate digital preservation and scholarly communication.

Show simple item record

dc.contributor.author Asad Waqar
dc.contributor.author Muhammad Shahbaz Tanveer
dc.contributor.author Jehanzeb Ahmad
dc.contributor.author Muhammad Aamir
dc.contributor.author Muneeb Yaqoob
dc.contributor.author Fareeha Anwar
dc.date.accessioned 2018-11-12T13:35:34Z
dc.date.available 2018-11-12T13:35:34Z
dc.date.issued 2017
dc.identifier.uri http://hdl.handle.net/123456789/7698
dc.description.abstract In developing countries like Pakistan, the capacity shortage (CS) of electricity is a critical problem. The frequent natural gas (NG) outages compel consumers to use electricity to fulfill the thermal loads, which ends up as an increase in electrical load. In this scenario, the authors have proposed the concept of a combined heat & power (CHP) plant to be a better option for supplying both electrical and thermal loads simultaneously. A CHP plant-based microgrid comprising a PV array, diesel generators and batteries (operating in grid-connected as well as islanded modes) has been simulated using the HOMER Pro software. Different configurations of distributed generators (DGs) with/without batteries have been evaluated considering multiple objectives. The multiple objectives include the minimization of the total net present cost (TNPC), cost of generated energy (COE) and the annual greenhouse gas (GHG) emissions, as well as the maximization of annual waste heat recovery (WHR) of thermal units and annual grid sales (GS). These objectives are subject to the constraints of power balance, battery operation within state of charge (SOC) limits, generator operation within capacity limits and zero capacity shortage. The simulations have been performed on six cities including Islamabad, Lahore, Karachi, Peshawar, Quetta and Gilgit. The simulation results have been analyzed to find the most optimal city for the CHP plant integrated microgrid. en_US
dc.language.iso en en_US
dc.publisher Bahria University Islamabad Campus en_US
dc.relation.ispartofseries ;doi:10.3390/en10101625
dc.subject Department of Electrical Engineering en_US
dc.title Multi-Objective Analysis of a CHP Plant Integrated Microgrid in Pakistan en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account