Petrophysical analysis of Qadirpur # 3 well, central Indus basin Pakistan (P-0971) (MFN 6432)

Welcome to DSpace BU Repository

Welcome to the Bahria University DSpace digital repository. DSpace is a digital service that collects, preserves, and distributes digital material. Repositories are important tools for preserving an organization's legacy; they facilitate digital preservation and scholarly communication.

Show simple item record

dc.contributor.author Mamoor Anwar Khan
dc.date.accessioned 2018-05-15T05:41:42Z
dc.date.available 2018-05-15T05:41:42Z
dc.date.issued 2016
dc.identifier.uri http://hdl.handle.net/123456789/6338
dc.description Supervised by Mr. Saqib Mehmood en_US
dc.description.abstract The main objective of the study is to evaluate the hydrocarbon potential of Qadirpur # 3 well. The well is located approximately 70 Ian to the northeast of Sukkur and 100 Ian to the east of Jacobabad in Ghotki, Sindh province, Pakistan. The tectonic structure encompasses the Mari- Kandh Kot High on the Punjab platform, a gently west dipping zone flanking the Indian shield. The purpose has been achieved by utilizing complete suite of wire line logs and the available well data. For evaluating hydrocarbon potential at reservoir level, one zone of interest has been in Sui Main Limestone. The reservoir zone is evaluated for the hydrocarbon potential in detail using set of equations and different formation evaluation charts by Schlumberger. Various physical properties like porosity, resistivity, volume of shale are calculated through different logs suites. The average shale volume calculated in Sui Main Limestone is 23.03%. The average effective porosity determined in the Zone of Sui Main limestone is 16.38%. The average water saturation determined in the Zone of Sui Main Limestone is 36.30%. The average hydrocarbon saturation determined in the Zone of Sui Main Limestone is 63.69%. The density and neutron cross plot chart reveal the reservoir lithology of selected zone i.e. Sui Main Limestone, is limestone. On the basis of calculated parameters, the marked zone is productive zone. en_US
dc.language.iso en en_US
dc.publisher Earth & Environmental Sciences, Bahria University Engineering School Islamabad en_US
dc.relation.ispartofseries BS Geology;P-0971
dc.subject Geology en_US
dc.title Petrophysical analysis of Qadirpur # 3 well, central Indus basin Pakistan (P-0971) (MFN 6432) en_US
dc.type Project Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account