DSpace Repository

To Analyze Dredging Requirement at Port Muhammad Bin Qasim and Suggest Suitable Measures to overcome Challenges

Show simple item record

dc.contributor.author Hafeez, Shahid Reg # 21316
dc.date.accessioned 2018-03-09T05:30:44Z
dc.date.available 2018-03-09T05:30:44Z
dc.date.issued 2014
dc.identifier.uri http://hdl.handle.net/123456789/5604
dc.description.abstract This research study is conducted to analyze the requirement of dredging at Port Qasim and find solutions to the problems being faced by the Port. The information or data regarding ports, dredging, types of dredgers, and challenges being faced by the Port Qasim in managing dredging affairs are obtained from secondary sources available with various departments of Port Qasim, websites, interviews, International Hydrographic Organization manuals, reference books, PQA Board Resolution, Implementation Agreements and Contract Agreements between Port Qasim and various firms etc. The secondary sources of information have only been considered in this study. The study also include analysis of dredging requirement and Cost-Benefit Analysis of conducting dredging with own PQA Dredger viz a viz contract dredging. Based on findings from the study and analysis, it is concluded that there is requirement of regular dredging at Port Qasim and it will further increase in future. It is also concluded that, it is cost effective to undertake dredging works with own PQA Dredger and there is dire need to restructure Dredging Department of Port Qasim to manage dredging matters. en_US
dc.language.iso en_US en_US
dc.publisher Bahria University Karachi Campus en_US
dc.title To Analyze Dredging Requirement at Port Muhammad Bin Qasim and Suggest Suitable Measures to overcome Challenges en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account