Petrophysical analysis of Qadirpur # 3 well, central Indus basin Pakistan (P-1096) (MFN 3925)

Welcome to DSpace BU Repository

Welcome to the Bahria University DSpace digital repository. DSpace is a digital service that collects, preserves, and distributes digital material. Repositories are important tools for preserving an organization's legacy; they facilitate digital preservation and scholarly communication.

Show simple item record

dc.contributor.author Asim Meraj
dc.contributor.author Osama Rashid
dc.contributor.author Faizan ul Haq
dc.date.accessioned 2017-08-01T05:01:39Z
dc.date.available 2017-08-01T05:01:39Z
dc.date.issued 2013
dc.identifier.uri http://hdl.handle.net/123456789/3204
dc.description Supervised by Dr. Tahseenullah Khan en_US
dc.description.abstract The main objective of the study was to carry out petrophysical analysis to evaluate the hydrocarbon potential of Qadirpur # 3 well. The purpose has been achieved by utilizing complete suite of wire line logs and the available well data. All the reservoir zones were evaluated for the hydrocarbon potential in detail using set of equations and different formation evaluation charts made by Schlumberger. The methodology adopted included measurement of shale volume by employing gamma ray log, estimation of porosity using density and neutron log, estimation of effective porosity, calculation of resistivity of water utilizing spontaneous potential log, evaluation of saturation of water and hydrocarbon saturation using Archie equation. The Average Shale Volume calculated in Sui Main Limestone Zone 3, Sui Upper Limestone Zone 2 and Habib Rahi Limestone Zone 1 are 20.44%, 14.33% and 15.72% respectively. The Average Porosity determined by NPHI (CNL) and RHOB (LLD) in Sui Main Limestone Zone 2, Sui Main Limestone Zone 3 and Habib Rahi Limestone Zone 1 are 23.55%, 20.27% and 19.93% respectively. The Average Effective Porosity determined in Sui Main Limestone Zone 3, Habib Rahi Limestone Zone 1 and Sui Upper Limestone Zone 2 are 16.63%, 16.32% and 9.21% respectively. The Average Water Saturation determined in Sui Upper Limestone Zone 2, Habib Rahi Limestone Zone 1 and Sui Main Limestone Zone 3 are 75.67%, 11.97% and 23.71% respectively. The Average Hydrocarbon Saturation determined in Habib Rahi Limestone Zone 1, Sui Main Limestone Zone 3 and Sui Upper Limestone Zone 2 are 88.02%, 64.52% and 24.23% respectively. The Density and Neutron cross plot chart reveal the reservoir lithology of Qadirpur # 3 well as Sui Main Limestone and the Habib Rahi Limestone. On the basis of above mentioned results the Habib Rahi Limestone Zone 1 and Sui Main Limestone Zone 3 are the productive reservoir zones of natural gas. en_US
dc.language.iso en en_US
dc.publisher Earth & Environmental Sciences, Bahria University Engineering School Islamabad en_US
dc.relation.ispartofseries BS Geophysics;P-1096
dc.subject Geophysics en_US
dc.title Petrophysical analysis of Qadirpur # 3 well, central Indus basin Pakistan (P-1096) (MFN 3925) en_US
dc.type Project Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account