GEOTECHNICAL HAZARD EVALUATION AND TUNNEL SUPPORT SYSTEM FOR SAFE AND SUSTAINABLE EXCAVATION OF ZALAM KOT TUNNEL, SWAT EXPRESSWAY

Welcome to DSpace BU Repository

Welcome to the Bahria University DSpace digital repository. DSpace is a digital service that collects, preserves, and distributes digital material. Repositories are important tools for preserving an organization's legacy; they facilitate digital preservation and scholarly communication.

Show simple item record

dc.contributor.author HASSAN TANVEER
dc.contributor.author MUHAMMAD ZOHAIB SARDAR
dc.contributor.author ZEESHAN MUNIR RAJA
dc.date.accessioned 2023-05-29T11:02:13Z
dc.date.available 2023-05-29T11:02:13Z
dc.date.issued 2019
dc.identifier.uri http://hdl.handle.net/123456789/15553
dc.description Supervised by Mr. Saqib Mehmood en_US
dc.description.abstract The basic aim of this thesis is to asses and analyze the techniques and methods for the safe excavation of Zalam Kot twin tube tunnel. Evaluation of primary support for tunnel is also carried out. This study is also focused to evaluate the geotechnical hazards related to excavation in order to avoid and minimize the damage in case of any hazardous geologic event. This twin tube tunnel site is located in Zalam Kot, District Malakand. This 1300-meter-long tunnel on Swat expressway near Malakand is being constructed by the Frontier Works Organization (FWO). This tunnel is situated at the foothills of MMT, and the formation encountered here is Saidu sharif Formation. This Formation is mainly composed of graphitic schist but at some places traces of mica were also encountered. According to field surveys the lithology encountered is mainly homogeneous, but at some places highly sheared zones, wedges and quartz veins were also encountered which acted as weak zones during the excavation process of tunnel. Rockfall assessment tests and tunnel hazard index is calculated for Geotechnical hazard evaluation of tunnel. During excavation, hazards encountered are of low index while the consequences are comparatively higher. In order to asses and analyze the excavation method, RMR technique was used which specified that rocks of this area had values ranging from 41-60, that classified these rocks of “Fair to Poor” quality. Based on RMR results, New Austrian tunneling method (NATM) is recommended for excavation. The primary support designed for Zalam Kot twin tube tunnel consists of rock bolts, lattice girders, shotcrete, steel ribs, kicker lining and wire mesh. Geosynthetic sheets such as geomembrane and geotextile sheets are installed for water proofing. en_US
dc.language.iso en en_US
dc.publisher Earth and Environmental Sciences, Bahria University Engineering School Islamabad en_US
dc.relation.ispartofseries BS Geology;P-2217
dc.subject Geology en_US
dc.title GEOTECHNICAL HAZARD EVALUATION AND TUNNEL SUPPORT SYSTEM FOR SAFE AND SUSTAINABLE EXCAVATION OF ZALAM KOT TUNNEL, SWAT EXPRESSWAY en_US
dc.type Project Reports en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account