Abstract:
This thesis aims to carry out the seismic interpretation and petrophysical analysis
of Pindori area, Eastern Potwar sub basin, by using the Seismic data and Well Log data.
For this objective, we were provided with 5 seismic lines and Resistivity and Porosity Well
Log Data of Pindori-01 by LMKR with the approval of DGPC.
Seismic Data Interpretation consist of base map generation, control line selection
and plotting of TD chart. A total four reflectors were marked on the control line and
extended on the other lines via strike line using Jump Correlation Technique. Two-way
travel time contour maps and depth maps were generated at top of Sakesar Limestone and
Chorgali Formation to understand the structural style and geometries present in the study
area. Two positive (anticlinal structures) were marked in the study area those are bounded
by reverse faults namely F1, F3 and F2, F4.
While the Petrophysical analysis of Pindori-01 well was carried out by the selection
of zone of interest which lies in Sakesar Limestone with the sonic porosity 5.385%,
effective porosity 4.899%, saturation of water 16.002% and saturation of hydrocarbons
83.9071%.